STATEMENT OF OBJECTIVES FOR THE ADVANCED AEROSPACE WEAPON SYSTEM APPLICATIONS PROGRAM 18 July 2008 PAN:# 1. BACKGROUND: The Acquisition Support Division (DWO-3) of the Defense Intelligence Agency (DIA) has the responsibility to provide guidance and oversight to the Department of Defense (DoD) acquisition process aiong with leveraging the DoD Intelligence Community to coordinate, produce and maintain projections of the future threat environment in which U.S. air, naval, ground, space, missile defense and information systems operate. In order to accurately assess the foreign threat to U.S. weapon systems, a complete as possible understanding of potential breakthrough technology applications employed in future aerospace weapon systems must be obtained. 2. OBJECTIVE: One aspect of the future threat environment involves advanced aerospace weapon system applications. The objective of this program is to understand the physics and engineering of these applications as they apply to the foreign threat out to the far term, i.e., from now through the year 2050. Primary focus is on breakthrough technologies and applications that create discontinuities in currently evolving technology trends. The focus is not on extrapolations of current aerospace technology. The proposal shall describe a technical approach which discusses how the breakthrough technologies and applications listed below would be studied and include proposed key personnel that have experience in those areas. 3. REQUIREMENTS: a) The contractor shall complete advanced aerospace weapon system technical studies in the following areas: Llifi 2. propulsion 3. control 4. power generation 5. spatitil temporal translation 6. materials 7, configuration, structure 8. signature reduction (optical, infrared, radiofrequency, acoustic) 9. human interface 10. human effects 11. armament (RF and DEW) 12. other peripheral areas i n support of (1 -11) b) It is expected that numerous experts with extensive experience (minimum of 10 years) in breakthrough aerospace research and development will be required to meet the demands of the above program. The offeror should clearly identify their approach to obtaining the services of and their utilization of these scientific and technical experts. Management personnel must include a lead integrator to oversee the work of the various analytical teams, and to integrate their findings into final coherent products. At least one member of each analytical team must have a PhD, although that member can be on several teams. A technical plan for conducting the advanced aerospace weapon system studies described above must be included in the offeror's proposal. (c ) Offeror must be able to produce integrated finished assessments in each of the above advanced aerospace weapon system technical areas. Finished reports and presentations, while highly analytical and technical, must be in a format suitable for dissemination at the highest levels of the federal government. In addition to the main technical section of each assessment, an executive summary utilizing clearly understandable (non-technical) language must also be contained in each report. (d ) To assess relevant experience, offerors shall submit at least three (3) references, including a POC name and phone number, with a brief description of the business relationship with the Government or other corporations. In addition, offerors should provide examples, conducted within the past 7 years, of having performed, as a prime contractor, the analysis, design, construction, and flight testing of high performance aircraft and/or satellites. Success in this program is dependent upon this capability and experience. 4. PLACE OF PERFORMANCE: The work under this contract shall be performed at the Contractor’s facility. 5. SECURITY REQUIREMENT: Contractor company and personnel proposed shall be clcarablc and able to obtain a security and facility clearance upon award of the contract. All requirements specified in this SOO may be based on materials classified at or below Top Secret with access to Sensitive Compartmented Information (TS/ SCI). The contractor shall comply with the terms and conditions of the DD-254 BEFO RE initiating any classified effort. The contractor shall notify the COR and Contracting Officer immediately upon the determination that higher classification requirements exist in order to accomplish the specified requirements. The contractor shall ensure that each individual assigned to this contract shall be identified, cleared, and approved through DI A/D AC-3 PRIO R to granting that individual access to, or authority to generate classified information in association with this effort. 5.1. Contractor shall provide a w'ork facility (including unclassified information systems) with a Top Secret Facility Clearance granted by the Defense Security Service (DSS). Cleared facilities are not required at contract inception. Offeror must provide personnel eligible for a Top Secret clearance level with further eligibility for SCI access. At least two personnel cleared at the Secret level are required at contract inception. 6. GOVERNMENT FURNISHED PROPERTY/EQUIPMENT: The Government will provide the contractor access to computers and peripherals such as printers as the Government deems necessary to access and produce classified information. These computers and peripherals remain the property of the Government. 2 7. GOVERNMENT FURNISHED INFORM ATION/DATA: Data required by the contractor to fulfill the terms of this contract shall be requested from the Government Project Lead (GPL). A good faith effort will be made to fulfill any legitimate request (as assessed by the GPL), however, the responsibility to collect information and data necessary for the conduct of this effort remains with the contractor. Any classified data provided by the Government tn support of this contract will remain the property of the Government and will be returned to the government not more than 30 days after contract conclusion. 8. CONTRACTOR ACQUIRED / GOVERNMENT OWNED PROPERTY: Any accountable property' acquired by the contractor with government funds during the execution of this contract shall become government owned property. The contractor shall obtain written permission from the CO or Contracting Officer Representative (COR) prior to any purchase of real property with government funds. The contractor shall establish and maintain an inventory of all such property. This property must be inventoried and returned to the government not more than 60 days after the end of the contract. 9. EQUIPMENT LEASE OR PURCHASE: fhc purchase of equipment is preferred, however, it may be more advantageous to the government to lease in certain circumstances. When it is contemplated a lease would be more advantageous to the government, contractor shall furnish the following information to the COR so the government can determine the best solution: 1. Estimated length of time the equipment will be used and the extent of use within that period 2. Financial and operating advantages of alternative types and makes of equipment 3. Cumulative rental payments for the estimated period of use 4. Net purchase price 5. Transportation and installation costs 6. Maintenance and other service costs 10. TRAVEL: It is anticipated that travel will be required for this contract. The Government will pay up to the rates specified in the government Federal Travel Regulations for travel destination. Travel reservations will be made by the contractor and will be reimbursed for actual costs only, with supporting documentation/rcccipts attached to the invoice. 11. DELIVERABLES: The contractor shall prepare the following deliverables: a. Status Reports - monthly reports outlining accomplishments, milestones, and work in progress. b. Project Management Plan - For each technical area, the team lead shall submit, at the 60 day point, an overview paper identifying the scope of die final report: a Plan of Action and Milestones, and the composition of the analytical team. c. Research Reports For each technical area, a comprehensive report and briefing forecasting potential advancements and their impact is to be submitted to the GPL by the end of the tenth month. An executive version of each report should also be submitted. Format will be specified by the GPL. d. Integrated Threat .Assessment - A final report and briefing that assesses the foreign threat from advanced aerospace platforms incorporating the technologies discussed in the individual research reports will be A A P P erson 1 provided to the GPL al the end of the period of performance. An executive version of the report should also be submitted. Format will be specified by the GPL. e. Resumes - The Contractor shall submit resumes of all key personnel proposed for this effort. The Government reserves the right to review resumes and qualifications prior to acceptance of individuals for assignment. 12. PERIOD OF PERFORMANCE: The term of this contract shall is anticipated to be 5 years which consists of a base year of 12 months from date of award plus four (4) 12 month option years. 13. CONTRACT TYPE: The contract shall be firm fixed priced (FFP). 14. KEY GOVERNMENT PERSONNEL: The Contracting Officer for this contract will be (b)(3) id use 424